Plant
TEAMWORK OF DESIGN, MANUFACTURE, AND QA MEMBERS, CREAT THE MOST SUPERIOR MOLDS.
▊5S PRACTICE
Due to the efforts on 5S Practice (Sort, Systematize, Sanitize, Standardize, and Self-discipline), safety, clean and tidy environment is ensured.
▊CAD DEPT.
We have a superior team to carry through all requirements from customers and rapidly proceed well-rounded design and manufacture.
▊CNC MACHINING DEPT.
Even very short delivery is required, Shin Mold is able to achieve it without panic.
That’s our competitiveness. Because of precision tools, mass-production of reliable parts can be achieved.
▊QA SYSTEM
We keep pursuing higher steps of QA system in order to provide customers more reliable tools.
Roughness of final discharge machining: about Rma×8 μm, EDM Graphite Master, 3D Coordinate Measuring Machine, Quality Assurance:ISO 9001:2008 Reg. No.: QAIC/TW/090056.
▊ASSEMBLY DEPT.
▊5S PRACTICE
Due to the efforts on 5S Practice (Sort, Systematize, Sanitize, Standardize, and Self-discipline), safety, clean and tidy environment is ensured.
▊CAD DEPT.
We have a superior team to carry through all requirements from customers and rapidly proceed well-rounded design and manufacture.
▊CNC MACHINING DEPT.
Even very short delivery is required, Shin Mold is able to achieve it without panic.
That’s our competitiveness. Because of precision tools, mass-production of reliable parts can be achieved.
▊QA SYSTEM
We keep pursuing higher steps of QA system in order to provide customers more reliable tools.
Roughness of final discharge machining: about Rma×8 μm, EDM Graphite Master, 3D Coordinate Measuring Machine, Quality Assurance:ISO 9001:2008 Reg. No.: QAIC/TW/090056.
▊ASSEMBLY DEPT.
To achieve mold life guarantee, besides reliable material and precision machining, well-rounded design on mechanical and mold structure is also a keyfactor.
Molding Parameters, Dimension check report, Highly reliable trial-shot shop, Co-meeting after mold completion, Pre-delivery inspection is conducted on the cooling piping, joint and tightness.